mindanao.politics.com.ph

Zamboanga City mega isolation center not made up of inferior materials – Mayor Climaco

0

Zamboanga City Mayor Beng Climaco has denied that the Mega Isolation Facility being constructed at the ZamboEcozone is made up of inferior materials.

Contrary to “malicious allegation,” the local chief executive said the isolation rooms are of the modular van type design wherein the metal partitions would need to have styrophor in between as this material acts as an insulator.

She said the pictures circulating online do not accurately convey the current status of the construction of the facility.

Climaco said City Engineer Christopher Navarro assured that before the city government accepts the Mega Isolation Project, any deficiencies would be corrected.

She also noted that the facility has an installed generator and water tanks to ensure stable power and water supply.

Comments
Loading...